顶管掘进机泥水平衡系统优化算法研究 被引量:2

Research on Optimized Algorithm for Slurry Control System of Pipe Jacking Machine
在线阅读 下载PDF
导出
摘要 针对目前顶管掘进机存在的智能化程度低、控制精度差等问题,将模糊控制的思想引入到顶管机泥水平衡控制中,提出了最优压力比的动态控制理念。工程应用显示,该方案能够取得较好的施工效果,可带来明显的经济效益和社会效益。 Aimed at the problems of low degree of intelligence, low control accuracy and other issues in the current main pipe jacking machine, a new slurry control system based on fuzzy control theory was introduced. Optimum pressure ratio control was proposed. The scheme has been successfully applied to the actual construction project, and has achieved good results, and it has brought in significant economic and social benefits.
作者 邢娅莉
出处 《筑路机械与施工机械化》 2014年第6期80-82,共3页 Road Machinery & Construction Mechanization
关键词 非开挖技术 顶管掘进机 模糊控制 优化算法 trenchless technology pipe jacking machine fuzzy control optimized algorithm
  • 相关文献

参考文献4

二级参考文献33

  • 1宋克志,孙谋.复杂岩石地层盾构掘进效能影响因素分析[J].岩石力学与工程学报,2007,26(10):2092-2096. 被引量:44
  • 2Teale R. The concept of specific energy in rock drilling[ J ]. Int. J. Rock Mech. Min. Sci. & Geomech, Abstr, 1965,2: 57-73
  • 3Rostami J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure [ D ]. Doctoral dissertation, Colorado School of Mines, Golden, CO, 1997:382
  • 4Nelson P P, Yousof A Al-Jalil, Laughton C. Improved strategies for TBM performance prediction and project management [ J]. Rapid Excavation and Tunneling conference Proceedings, 1999:963-979
  • 5Richard Edward Gertsch. Rock toughness and disc cutting[ D]. University of Missouri-Rolla,2000
  • 6Gertsch R, Gertsch L, Rostami J. Disc cutting tests in Colorado Red Granite implications for TBM performance prediction [ J ]. International Journal of Rock Mechanics and Mining Sciences,2004,44 (2) :238-246
  • 7Ribacchi R, Lembo Fazio A. Influence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel) [J]. Rock Mechanics and Rock Engineering,2005,38(2) :105-127
  • 8Acaroglu O, Ozdemir L, Asbury B. A fuzzy logic model to predict specific energy requirement for TBM performance prediction[J]. Tunnelling and Underground Space Technology,2004,19(6) :597-605
  • 9Acaroglu O,Ergin H,Eskikaya S. The use of fuzzy logic methods to predict specific energy for roadheaders[ J]. 10th International Symposium on Mine Planning and Equipment Selection ,2001,9, New Delhi, India: 173-179
  • 10Benardos A G, Kaliampakos D C. Modelling TBM performance with artificial neural networks [ J ]. Tunnelling and Underground Space Technology,2004,19 (6) :597-605

共引文献35

同被引文献24

引证文献2

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部