摘要
带状GPS控制网的优化布置与施测对于带状工程至关重要,对带状控制网结合实例的分析及探讨有其必要性。论文通过建立GPSE级控制网并对控制网实施有效的观测,从而为分析及探讨提供案例。具体以广州市增城地区增江河道采砂控制规划工程GPS控制网的布设及观测实施为例,通过全盘考虑整个控制测量的各道工序,得出了一些测量工程技术管理及组织实施方面的经验。论文着重对GPS网的数据处理进行了实例分析,理论结合实际,针对GPS控制技术在带状工程测量中的应用进行了较深入的探讨。并提出了一些有益的工作方法。
Optimization layout and implementation survey of ribbon GPS control network is crucial important to ribbon Engineering,and is necessary to ribbon control network with examples of analysis and study.through establishing GPS E level control network to implement effective observation and survey to control network,so as paper provides case analysi and explore.take layout and survey implementation of GPS control network of exploitation sand control planning project in Zengjiang river of Zengcheng area of Guangzhou City for an example,through considering every process of whole control survey,to draw a number of experience in survery Engineering and technology management and organization of the implementation.paper focuses on GPS network date processing to do case studies,combining theroy with practice,to explore the application of GPS control technology in ribbon Engineering survey,and put forward some useful methods of work.
出处
《工程勘察》
CSCD
北大核心
2009年第S2期435-439,共5页
Geotechnical Investigation & Surveying
关键词
带状工程
GPS控制网
布网
精度统计
Tape project
GPS under the control of net
Drop a net
Accuracy counts