针对在土石坝的安全鉴定勘察过程中,往往会遇到诸如周期短、经费有限,试验、取样困难,试验参数的选取复杂等问题,指出应经济合理地布置勘探工作、事前制定详细完善的计划、综合分析各种参数等措施才能使安全鉴定勘察工作圆满完成。
In view of the problems that are often encountered in the course of engineering geological exploration for earth-rock dam safety appraisal such as insufficient time and funds,difficult testing and sampling,complicate selection of testing parameters etc.,it is put forward that exploration for safety appraisal can only be completed satisfactorily when exploration work is arranged in a economic and rational way,detailed and perfect plan is drafted in advance,and a synthetic analysis of all parameters is conducted.