摘要
随着经济的发展,科技的进步,我国风力发电技术已经取得了很大的进步.我国的风电总装机数量排在世界前列,风力发电的广泛应用,为我国各领域的发展起到了推动作用.但是在风力发电事业逐渐发展的情况下,也存在着一些问题需要解决.我国出现的几起风电机组脱网事故引起了广泛的重视,经过调查发现风电机组脱网事故是由于风电场集电线路的设计存在缺陷而导致风电场出现安全事故,因此对于风电场集电线路的优化设计迫在眉睫.
With the development of economy and the progress of science and technology,wind power generation in China has made great progress,and wind power generation has been widely used,which has played a role in promoting the development of various fields in our country.The total installed wind power in China ranks first in the world,but there are still some problems to be solved in the case of the gradual development of wind power industry.Several wind turbine disconnection accidents have attracted wide attention in China.Through investigation,it is found that the disconnection accidents of wind turbine are due to the design of wind farm collector lines.Defects lead to safety accidents in wind farms,so the optimization of wind farm collector lines is imminent.
出处
《电力系统装备》
2019年第16期70-71,共2页
Electric Power System Equipment