摘要
在目前土地政策的环境下,由于新改建公路项目的新增用地受到严格的控制,要求设计人员对项目有更高的总体把握和细节处理,从路线、路基、路面及桥涵设计中把控用地,然后反馈到总体设计后再次对细节进行调整,保持设计过程中与各参建单位有更多的互动和沟通,在满足规范的前提下,更好地适应项目所在地的要求。
Under the current land policy environment,as new land for newly rebuilt highway projects is strictly controlled,designers are required to have a higher overall grasp and detailed treatment of the project,and control land from the design of routes,subgrades,pavements and bridges and culverts.And then feedback to the overall design to adjust the details again,maintain more interaction and communication with the participating units during the design process,and better meet the requirements of the project location on the premise of meeting the specifications.
出处
《建筑技术开发》
2020年第10期135-136,共2页
Building Technology Development
关键词
用地受限
新改建公路
路线设计
路基
limited land use
newly rebuilt highway
route design
subgrade
作者简介
朱杰锋(1987—),男,广东清远人,工程师,主要研究方向为道路桥梁设计。