海上风电场工程高桩承台基础施工费用研究 被引量:7

Research on construction cost of high pile cap foundation of the offshore wind farm
在线阅读 下载PDF
导出
摘要 通过对海上风电高桩承台基础施工工艺的研究,分析了高桩承台基础的施工资源配置和施工效率;按照实物法的思路对海上风电高桩承台基础施工费用中钢管桩运输安装等主要单价进行测算;并引入蒙特卡罗模拟进行数据的合理性分析。文章为合理确定海上风电场工程建设投资提供了思路和参考数据。 By means of researching of the construction technology of the high pile cap foundation of the offshore wind power,the paper analyzes the resource allocation and efficiency of construction. In accordance with the ideas of real object method, the paper calculates the main unit prices (transportation and installation of steel pipe pile etc.)of construction cost of the high-pile cap foundation of the offshore wind power. The Monte Carlo simulation was used to analyze the dataˊs rationality, which provides the ideas and reference data for reasonably determining the construction cost of the offshore wind farm.
出处 《可再生能源》 CAS 北大核心 2017年第6期912-918,共7页 Renewable Energy Resources
关键词 海上风电 高桩承台基础 实物法 蒙特卡罗模拟 费用 offshore wind power high pile cap foundation the real object method monte carlo simulation cost
作者简介 李东伟(1984-),男,河南商丘人,硕士,工程师,经济师,主要从事工程经济诲询与管理工作。E-mail:li_dw@ecidi.com
  • 相关文献

参考文献6

二级参考文献18

共引文献172

同被引文献28

引证文献7

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部